The refurbished footbridge was re-positioned from the car park back into its place over the tracks during the early hours of this morning. Whilst in the car park it has had the window frames and roof added to the walkway.The internal station access steps to it are not as yet in use so I was able to take a photograph from the temporary bridge this morning. Thanks to Nick Campbell for the pictures taken between 1am and 3am!